Close Menu
Finance Pro
  • Home
  • Art Gallery
  • Art Investment
  • Art Stocks
  • Cryptocurrency
  • Finance
  • Investing in Art
  • Investments
Facebook X (Twitter) Instagram
Trending
  • Banks assessing impact of motor finance ruling – Daily Business
  • When will car finance compensation be paid out and how much could you get? – The Guardian
  • Top Crypto Gainers, Cryptocurrency Gainers, Crypto Gainers Live Price Today
  • Millions of drivers in line for £830 each from car finance scandal – The Telegraph
  • £7.5bn for car finance victims – but don’t pop the champagne just yet, writes Dean Dunham
  • FCA to release details of UK car finance scandal compensation scheme – The Guardian
  • Car finance redress scheme to be announced TODAY – are you one of up to 14 million due £700 each on average? – Money Saving Expert
  • Jim Cramer’s Biggest Cryptocurrency and Blockchain Stock Hits & Misses: Top 5 Stocks
  • Privacy Policy
  • Terms and Conditions
  • Get In Touch
Finance ProFinance Pro
  • Home
  • Art Gallery
  • Art Investment
  • Art Stocks
  • Cryptocurrency
  • Finance
  • Investing in Art
  • Investments
Finance Pro
Home»Art Gallery»Inside the Tilbury Douglas restoration of Scottish National Gallery
Art Gallery

Inside the Tilbury Douglas restoration of Scottish National Gallery

May 9, 20243 Mins Read


Scottish National Gallery
Bored piles support the vertical load (Image: Bryan Robertson)

Sitting in a World Heritage Site in the heart of Edinburgh, adjacent to Princes Street Gardens, the Scottish National Gallery (SNG) is A-listed and one of the most visited tourist destinations in the city.

Recently, while up to 4,500 tourists visited the galleries daily, the Tilbury Douglas team was tunnelling, contiguous piling, hydraulic jacking, mini piling, deconstructing and soil nailing, making the safety of the building and the public a primary concern. And, in what has been described as one of the most complex engineering projects undertaken in a heritage building in Scotland, being located above railway tunnels only added to the challenge.

Delivering our client’s vision

The outcome has transformed the building to provide world-class facilities for the innovative display of the Scottish Art Collection. The main objectives were to increase the physical display space, improve circulation areas, entrances and amenities, and enhance the general flow and comfort of visitors. Access is now available to the Scottish Art Collection directly from the gardens.

The project manager was Stuart Burgess, and regional director Barry O’Hagan FCIOB was heavily involved in the latter half of the project. Our works included extensive remodelling of the embankments and constructing new sandstone steps and paths, and soft landscaping. Over an eight-week period, we moved over 1,200 HGVs across the Mound Precinct – one of the busiest live pedestrian areas of Edinburgh.

New facades have improved the visitors’ experience (Dapple Photography)

The key project vision of improved circulation within the gallery could not have been realised without creating a tunnel under the South Portico. Our team developed bespoke temporary works solutions that allowed the 6m deep excavation of the link tunnel directly under the listed porticos to progress safely while evidencing that movement, vibration and masonry strain did not damage the historic fabric.

Transfer from temporary to permanent works

Needle beams were installed by drilling horizontal cores through the 1850s foundations before pressure grouting. Bored piles were installed to support the vertical load of the structure and retain the adjacent ground under large surcharge loads from the listed portico facade.

Hydraulic jacks were used to provide a safe and controlled load transfer between temporary and permanent works. By modelling thousands of points of data, we were able to quickly predict differential movements or strains. Low vibration demolition techniques recognised the sensitivity of the building. The complex tunnelling excavation works were successfully completed with no adverse movement.

The gallery can now be accessed from the gardens (Dapple Photography)

To protect the priceless exhibits, we worked with specialist partners to develop a dust extract scheme which utilised proprietary equipment to comply with exacting criteria agreed with the gallery’s advisers.

Work included rebuilding facades to improve the visitors’ experience. The new elevation to Princes Street Gardens East improves views from and towards the galleries and emulates a solid, traditional masonry wall rather than a veneer of cladding. External areas, including the Spanish War memorial and the iconic Playfair Walkway, both listed, have been restored using materials sympathetic to the history of the building.

Collaborating with stakeholders

The location and nature of the works demanded proactive collaboration with a large number of client bodies and stakeholders. These included City of Edinburgh Council and the organisers of the Winter Festival and the Fringe Festival, Network Rail – whose tunnels leading to Waverley Station are located immediately below – and thousands of runners taking part in the Edinburgh Marathon who ran through our site.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Art Gallery puts on impressive display to strike for James Ferguson and Qatar Racing despite PJ McDonald dropping his rein

March 30, 2026 Art Gallery

Citizens Design Bureau completes V&A galleries for ‘dazzling’ decorative art collection

March 27, 2026 Art Gallery

Cornwall Museum and Art Gallery, Truro free entry Saturday

March 26, 2026 Art Gallery

See work of new and established artists at Bingley Gallery

March 21, 2026 Art Gallery

Lauren Laverne on kids screaming in art galleries: ‘We’ve all been there’

March 20, 2026 Art Gallery

The Standard podcast: Will art galleries replace London’s night clubs?

March 20, 2026 Art Gallery
Add A Comment
Leave A Reply Cancel Reply

Don't Miss

Banks assessing impact of motor finance ruling – Daily Business

March 30, 2026 Finance 3 Mins Read

Lloyds is reviewing the cost of the ruling Banks are reviewing the impact of the…

When will car finance compensation be paid out and how much could you get? – The Guardian

March 30, 2026

Top Crypto Gainers, Cryptocurrency Gainers, Crypto Gainers Live Price Today

March 30, 2026

Millions of drivers in line for £830 each from car finance scandal – The Telegraph

March 30, 2026
Our Picks

Banks assessing impact of motor finance ruling – Daily Business

March 30, 2026

When will car finance compensation be paid out and how much could you get? – The Guardian

March 30, 2026

Top Crypto Gainers, Cryptocurrency Gainers, Crypto Gainers Live Price Today

March 30, 2026

Millions of drivers in line for £830 each from car finance scandal – The Telegraph

March 30, 2026
Our Picks

Millions of drivers who were mis-sold car finance to receive £829 average payout – live updates

March 30, 2026

Compensation details for millions of drivers in car finance scandal revealed | News UK Video News

March 30, 2026

Drivers to learn details of compensation scheme for mis-sold car finance – live updates

March 30, 2026
Latest updates

Banks assessing impact of motor finance ruling – Daily Business

March 30, 2026

When will car finance compensation be paid out and how much could you get? – The Guardian

March 30, 2026

Top Crypto Gainers, Cryptocurrency Gainers, Crypto Gainers Live Price Today

March 30, 2026
Weekly Updates

Crypto exchange Bullish’s US IPO filing reveals quarterly loss

July 19, 2025

Taylor Fritz Investing In ‘Secret Tool’ For Training: Eight Sleep

April 9, 2024

Govt Admits No Real-Time Tracking Of Crypto Transactions

July 22, 2025
  • Privacy Policy
  • Terms and Conditions
  • Get In Touch
© 2026 Finance Pro

Type above and press Enter to search. Press Esc to cancel.