Close Menu
Finance Pro
  • Home
  • Art Gallery
  • Art Investment
  • Art Stocks
  • Cryptocurrency
  • Finance
  • Investing in Art
  • Investments
Facebook X (Twitter) Instagram
Trending
  • The Beginner’s Guide to Buying Your First Cryptocurrency
  • Ellinas Finance board to meet in late April for 2025 financial results
  • Falmouth Art Gallery new programme of exhibitions 2026/27
  • Falmouth Art Gallery unveils ambitious 2026/27 exhibition programme
  • X Introduces Automatic Account Locks to Combat Cryptocurrency Phishing Schemes
  • Lloyds Banking Group sets aside £2bn for car finance compensation payouts
  • Hill View Primary School visit Southampton City Art Gallery
  • Protection from scams: Layton City bans cryptocurrency ATMs due to fraud | News, Sports, Jobs
  • Privacy Policy
  • Terms and Conditions
  • Get In Touch
Finance ProFinance Pro
  • Home
  • Art Gallery
  • Art Investment
  • Art Stocks
  • Cryptocurrency
  • Finance
  • Investing in Art
  • Investments
Finance Pro
Home»Art Investment»Network Rail completes final phase of £375m investment to install state of the art signalling system
Art Investment

Network Rail completes final phase of £375m investment to install state of the art signalling system

February 19, 20243 Mins Read


Network Rail and South Western Railway have officially switched on new signalling equipment to bring more reliable journeys to customers travelling between Reading, London and Guildford.

From Saturday 10 to Sunday 18 February, Network Rail completed the final phase of the resignalling work in the Wokingham area as part of the five-year £375m programme of work to bring the 1970s signalling equipment up to modern standards.  

During the most recent nine-day closure, engineers worked around the clock to install 43 new signals, as well as upgrade two level crossings at Wokingham station and Easthampstead Road (Star Lane) and renew a double railway junction at Wokingham.

Now complete, customers will benefit from a modern digitalised signalling system that will help improve train performance, increase future capacity, result in fewer delays, and enhance the safety of level crossings.

As part of the five-year programme, Network Rail moved control of the signalling equipment between Feltham and Wokingham and transferred it to Basingstoke, into the Rail Operating Centre (ROC), as well as upgraded 16 level crossings and installed 500 pieces of signalling equipment, which covers 80 miles of railway across Feltham, Hounslow, Shepperton, Twickenham, Windsor & Eton Riverside and Wokingham.

Moving control to the ROC allows signallers to communicate more effectively with each other as they are in the same room rather than remote signal boxes and is more cost efficient to operate.

Matt Pocock, Network Rail’s Wessex route director, said: “It’s fantastic to see the completion of our Feltham to Wokingham resignalling programme. We’ve worked closely with SWR and our contractors over the past five years to bring the signalling system up to modern standards and I’m pleased to see the completion of the final piece of this complex and challenging jigsaw puzzle.

“The new digital signals have replaced the old equipment which became unreliable and harder to maintain and the new state of the art signalling will improve the reliability of this key stretch of railway and in turn help reduce delays for our customers.

“We’re extremely grateful to customers and local residents living alongside the railway for their patience and understanding while we carried out this final phase of work and I look forward to seeing the realisation of the benefits this investment will bring.”

Peter Williams, South Western Railway’s customer and commercial director, said: “We’re very pleased to see that the Feltham-Wokingham Resignalling Programme has been completed, bringing a modern, more reliable signalling system to some very busy parts of our network.

“Work to introduce this new signalling system has been disruptive at times and we’d like to say a big thank you to our customers for their continued patience.”

Scott Kelley, managing director for AtkinsRéalis, commented: “The Feltham-Wokingham resignalling programme was a complex project which required extensive collaboration across the supply chain and with our client Network Rail. Its completion is a significant achievement for the UK rail industry, as demonstrated by industry awards for innovation and collaboration for the brilliant team. We pioneered several cutting-edge digital solutions, including advanced systems engineering and automated testing and data compilation.

“The modern signalling system provides advanced fault detection and prediction capabilities, meaning this key passenger and freight network now provides improved levels of reliability and safety.”

Photo credit: Network Rail

image_pdfDownload article



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Canvas to capital: How art is becoming India’s new investment asset | Personal Finance

March 26, 2026 Art Investment

Art and tax: When collectors can avoid CGT

March 20, 2026 Art Investment

Bank of America Says “A Lot of Art Changing Hands” — Why High‑Net‑Worth Investors Are Paying Attention

March 13, 2026 Art Investment

Fine art investments under scrutiny

February 14, 2026 Art Investment

Art Investment Platform Masterworks Sues Key Former Staffer

February 13, 2026 Art Investment

Zeon Corporation Makes Strategic Investment in Chemify to Accelerate Digital Chemistry Innovation and Drive Development of New Materials Through State-of-the-Art Automated Molecular Design and Synthesis – The AI Journal

February 12, 2026 Art Investment
Add A Comment
Leave A Reply Cancel Reply

Don't Miss

The Beginner’s Guide to Buying Your First Cryptocurrency

April 3, 2026 Cryptocurrency 3 Mins Read

Key PointsYou can buy your first cryptocurrency through a crypto exchange or a brokerage that…

Ellinas Finance board to meet in late April for 2025 financial results

April 3, 2026

Falmouth Art Gallery new programme of exhibitions 2026/27

April 3, 2026

Falmouth Art Gallery unveils ambitious 2026/27 exhibition programme

April 3, 2026
Our Picks

The Beginner’s Guide to Buying Your First Cryptocurrency

April 3, 2026

Ellinas Finance board to meet in late April for 2025 financial results

April 3, 2026

Falmouth Art Gallery new programme of exhibitions 2026/27

April 3, 2026

Falmouth Art Gallery unveils ambitious 2026/27 exhibition programme

April 3, 2026
Our Picks

Cryptocurrency scams on the rise in Waltham

April 2, 2026

#CryptoCornerSeason2 | #Bitcoin In Focus – Closes Q1 2026 with negative returns – April ranks as 1 of top 3 months; Has ended 10 times in the green with 20.9% avg gain Manisha Gupta | Binance | #CNBCTV18Market #Cryptocurrency #Ethereum #Binance # – LinkedIn

April 2, 2026

Beleaguered Gloucester City Council to bolster finance team after ‘chaotic’ time

April 2, 2026
Latest updates

The Beginner’s Guide to Buying Your First Cryptocurrency

April 3, 2026

Ellinas Finance board to meet in late April for 2025 financial results

April 3, 2026

Falmouth Art Gallery new programme of exhibitions 2026/27

April 3, 2026
Weekly Updates

London’s National Gallery to ban liquids after attacks on paintings

October 17, 2024

Big US banks dominated fossil fuel financing in 2023, campaign report says

May 13, 2024

3 Factors That Could Cause a Cryptocurrency Boom in the Second Half of 2025

July 25, 2025
  • Privacy Policy
  • Terms and Conditions
  • Get In Touch
© 2026 Finance Pro

Type above and press Enter to search. Press Esc to cancel.